113MW HFO Power Plant at Bogra by Confidence Power (MAN B&W Engine)





113MW HFO power plant under construction by Confidence Power Limited in Bogra. This HFO power plant will produce  electricity for next 15 years. MAN Diesel & Turbo provide heavy fuel oil engines to the new power plant.

Due to no direct water way MAN Diesel & Turbo delivering HFO engine part to part. In the power plant site engine components will be attached together. Now this process on going. MAN Germany and MAN Bangladesh team working in the power plant site.


450MW HFO Power Plant Information (By Confidence Group):

Engine Provider: MAN Diesel & Turbo SE.

Engine Type: 18V 48/60TS

Power Plant Owner: Confidence Power Ltd. (CPL)

Tariff: 8.34 Taka per Kw/hr.

One thought on “113MW HFO Power Plant at Bogra by Confidence Power (MAN B&W Engine)

  • May 13, 2018 at 1:27 pm
    Permalink

    I have noticed you don’t monetize your website, don’t
    waste your traffic, you can earn extra cash every month
    because you’ve got high quality content. If you want to know how to make extra bucks, search for: Ercannou’s essential
    adsense alternative

    Reply

Leave a Reply

Your email address will not be published. Required fields are marked *